Hardy Toll Road
Seven photographs move north from the future downtown connection to the airport connector, pairing each major Hardy Toll Road scene with the hand-drawn locator maps that guided readers through the original page.
Last updated May 28, 2001

Collection: TexasFreeway Houston photographs
The toll road meets Loop 610 where the planned downtown connection would begin.
Corridor photographs
Hardy Toll Road photographs
↗ EnlargeFuture downtown connector stub-out
↗ EnlargeHardy Toll Road connectors at Loop 610
↗ EnlargeThe Hardy Toll Road and railroad corridor
↗ EnlargeA Hardy Toll Road interchange
↗ EnlargeThe tollway crosses the railroad
↗ EnlargeThe airport connector interchange
↗ EnlargeThe Hardy airport connector
Route orientation
Hardy Toll Road route map

Hardy Toll Road route map
From the original archive
Hardy Toll Road history and facts
Hardy Toll Road
Also see: Photo Gallery Page 2 - North Section
The Hardy Toll Road was authorized by Houston voters in 1983 and completed in 1988. It has not met its traffic projections and is not generating enough revenue to meet its bond payments, but this is not a problem because the Sam Houston Tollway is a cash cow, generating more than enough revenue to cover the Hardy shortfall. The reason for the shortfall is because the Hardy Tollway runs parallel to I-45, which is free, so the Hardy Toll road only sees significant traffic during rush hour.
The Hardy Toll road has been a boon to the Woodlands, providing a high-speed route to downtown Houston and ensuring the Woodland's perennial status as #1 in new home starts in Houston. The road is also a pleasure to drive, since much of it is flat and straight, and nearly all the route is free of commericalism.
Since around 1990, there have been plans to extend the Hardy Toll Road into downtown Houston. It's finally going to happen, and better yet, it's going to be a freeway! In October 2000, the Harris County Commissioners Court voted to approve a schematic of the new facility. According to sources at the Harris County Toll Road authority, construction on the downtown connector will begin mid to late 2002, and be complete by late 2004 or early 2005. The connector will use ramps that are already under contruction at the US59/I-10 interchange, and then proceed along railroad right-of-way to the existing toll road terminus at I-610. The new freeway will have 4 lanes. See the photo below of the stub-out where the new freeway will connect to the new interchange at US 59 and IH-10.
| Limits | I-610 to I-45 north, parallel to I-45, about 2 miles west of I-45 |
|---|---|
| Length | 21.6 miles |
| Constructed | Started September 1984. Section 1 opened September 1987, section 2 opened June 1988 |
| Cost | $365,925,000. (1987 dollars) |
| Lanes | 6 lanes from I-610 to airport connector; 4 lanes northward. |
| Airport connector, Constructed | Opened January 28, 2000 |
|---|---|
| Airport connector, Cost | $30 million (approx., may not include airport contribution) |
| Airport connector, Length | approx 3 miles |
All photos taken September 30, 2000, except as noted
Continue northward with Photo Gallery Page 2 - North Section