Four photographs record the long connector taking shape between Beltway 8 and the Hardy Toll Road in 2001. The route maps and original project summary explain where the ramp was built and what it connected.
Last updated 21 December 2001

Collection: TexasFreeway Houston construction photographs
A long line of columns traces the future connector beside the Beltway 8 feeder.
Construction photographs
Hardy Toll Road / Beltway 8 construction photographs
December 20, 2001
↗ EnlargeColumns along the Beltway 8 feeder
Looking east along the eastbound Beltway 8 feeder. On December 20, 2001, a long line of columns were in place. 20-December-2001.
↗ EnlargeConnector construction across Beltway 8
(high resolution 179k) Looking at the construction across Beltway 8. 20-December-2001.
↗ EnlargeNorth along the Hardy Toll Road
This view looks north along the Hardy Toll Road. 20-December-2001.
May 2001
Route orientation
Hardy Toll Road / Beltway 8 construction location

Hardy Toll Road / Beltway 8 construction location
From the original archive
Hardy Toll Road / Beltway 8 connector
View route map and supporting images

Hardy Toll Road connector plan
This is a map view of the new connector from EB BW8 to the NB Hardy Toll road. This will be the first direct connector at this interchange. Connections presently must be made via the feeders. At .905 miles (1.46 km) long, this is a very long ramp.
Collection: TexasFreeway Houston route maps
Connector construction at Hardy Toll Road / Beltway 8
| Project | Add 1 direct connector, eastbound Beltway 8 to northbound Hardy Toll Road |
|---|---|
| Cost | $12.4 million |
| Begin | Q1 2000 |
This will greatly improve the accessibility of the Hardy Toll Road from Beltway 8.